Was carried out the second launch of Left Way in SECTION 9B – SAVUSHKINA, composed by the entire launching nose of 72,00 m long and 110 tons in weight, and two connector elements of the main frame.

Was carried out the first launch of the entire WHSD project, with the use of equipments produced by LMV.

Established in 2013, LMSTEEL is an engineering company specialized in the field of civil engineering with reference to the great structures in metal constructions.